Skip to content

Blog

ITGC Audit Checklist: Controls, Evidence and Testing Procedures

An ITGC audit checklist maps each relevant technology risk to a control, an accountable owner, supporting evidence and a testing procedure. Start with the systems that support financial reporting, then assess access, change management, development and IT operations. Use the checklist to find gaps in coverage before selecting audit samples.

Define the systems and risks in scope

Start with a reporting risk, such as incomplete revenue recorded in the general ledger. Trace the data back through the relevant application, interfaces and reports. Record the entities, environments and technology dependencies that matter to that risk. Identify the person responsible for each control and the source of its evidence.

For hosted systems, map provider and customer responsibilities. A provider may operate the platform while your team administers user access, approves tenant configuration and monitors integrations. If you use a service auditor’s report as evidence, confirm that it covers the service and controls relevant to financial reporting. Check the period covered, the tests and results, and any complementary user entity controls your organization must perform. Document who owns those controls and how you’ll address gaps in the period or scope. See PCAOB AS 2201, Appendix B for service organization considerations.

For the broader framework, see IT general controls, examples and SOX requirements.

How to use this checklist

For each applicable row, write the exact control your organization performs. Add its objective, owner, frequency, systems, source population and evidence location. A policy establishes what should happen. Dated system records, a documented decision and follow-through show what happened. Where a row is out of scope, record the reason and the dependency you considered.

Use these fields in your audit tracker: control ID, system and entity, risk, control owner, frequency, source population, evidence location, test procedure, open gaps and action due date.

ITGC audit checklist

Control area Example control Evidence to collect Illustrative testing procedure
Access · provisioning The application owner approves in-scope access before assignment. Request, approval, provisioned entitlement and timestamps. Compare approved access and data scope with the actual grant. Check sequence.
Access · leavers IT disables or revokes in-scope access within the defined timeframe. HR departure population, account mapping and system removal records. Trace departures to relevant accounts and compare removal times with the required deadline.
Access · privileged access Production administration is restricted and elevated access expires when authorized use ends. Privileged account inventory, approvals, elevation and expiration records. Compare actual privilege and duration with the authorization. Investigate unmanaged accounts in scope.
Access · periodic reviews Accountable reviewers decide on in-scope access and approved removals are verified. Review population, reviewer decisions and system records of removals. Check population coverage, review decisions and execution of selected removals.
Change · standard releases Relevant changes are tested and authorized before deployment by an appropriate person. Production deployment records, linked tickets, approval and test results. Trace deployed items back to evidence for the same version or setting and check authorization and deployment responsibility.
Change · emergency releases Emergency changes follow the required expedited approval and retrospective review. Emergency change population, deployment log and dated follow-up. Compare actions and timing with the emergency procedure, including escalation of overdue reviews.
Development · acceptance Owners approve go-live after required testing and migration reconciliations. Acceptance criteria, test results, reconciliations, open issues and sign-off. Trace approval to the results for the deployed release and check how outstanding differences were resolved or accepted.
Operations · backups and recovery Relevant backups run and recovery is tested against documented requirements. Backup results, restore-test record and follow-up for failures. Inspect selected backup results and verify what the restore test recovered and how exceptions were handled.
Operations · jobs and interfaces In-scope processing failures are investigated through resolution. Job logs, incidents, reruns and reconciliation results. Trace selected failures to closure and verify completeness of downstream processing.

What should an ITGC checklist capture for AI agents?

For each in-scope AI workflow, record the business owner, the identity the agent uses in the target system, the application and data scope, and whether the agent can read, recommend or take action. Include service accounts or integration credentials used on the agent’s behalf. If several workflows share an account, check whether the records can distinguish which workflow initiated an ERP action.

Keep an approved access record, the deployed workflow version and a sample execution trace. For a write action, match the trace and any required approval to the ERP record. Where the workflow runs unattended, capture who reviews failed or incomplete runs and how they’re resolved. Use the SafePaaS guide to access governance for AI agents to scope the identities behind the workflow.

Check evidence readiness

Record the source system, query or report parameters, filters, extraction time and period for each population. Check completeness by reconciling the population to an authoritative source and investigating missing records. Check accuracy by tracing key fields, such as account ID, entitlement and timestamp, to source records. Keep the report parameters, reconciliation and unresolved differences with the evidence. See PCAOB AS 1105, paragraph .10, on completeness and accuracy of audit evidence. Review whether the report includes relevant account types, entities and events, including changes made outside a standard ticket workflow. Retain the output and its extraction details together. For an approved access removal, keep the review decision and the evidence of the change in the target application.

For selected access and configuration controls, SafePaaS continuous ITGC and ITAC control can help gather evidence and route review work. The control owner still defines scope, validates the source and resolves exceptions.

Prioritize gaps before fieldwork

Classify each item as a design gap, a missed control activity or an evidence gap pending investigation. Assign an owner and action date. Start with gaps that affect multiple controls, such as an incomplete production-change population. Gather alternative evidence where it exists and document what you can and cannot conclude from it.

Which questions need separate ERP controls?

Completing this checklist can help establish how the IT environment is governed. Business controls still need evidence that a supplier change was verified, an invoice followed its approval path or a payment met policy. For application-level examples, see the ITAC audit checklist. The multi-layered ERP controls model explains the additional questions that access, process and transaction controls address.

What to do before testing begins

Confirm scope with the process owners. Agree which population supports each control, verify the period and preserve the source records. Put open gaps and conflicting evidence in front of the test lead early enough to adjust the procedures.

See how to test ITGC design and operating effectiveness

Frequently asked questions

Is there one mandatory SOX ITGC checklist?

SOX ITGC scoping depends on financial reporting risks and the controls that address them. Use a checklist to document why an activity is relevant, who owns it and how you will evaluate it.

What evidence is needed for an access review?

Keep the population reviewed, the criteria used, reviewer identities, dated decisions and evidence of follow-up. For any approved removal, retain a system record showing the entitlement was removed or document the open exception and its owner.

How do cloud providers affect the checklist?

The service boundary determines which activities your organization performs and which it relies on the provider to perform. Review the provider’s assurance evidence for the relevant systems and period, then identify the controls your organization still owns.

See governance applied to the access you have today

A working session with a governance specialist — not a slide presentation.

Book your tailored demo

Read next